| Tipo Producción |
Título |
Autor |
Año de Producción |
DOI |
Revista |
Fuente |
Cuartil de ScimagoJR o JCR* |
|
Artículo en revista científica
|
A heuristic buffer sizing algorithm for implementing a renewable energy project
|
Zohrehvandi S.
|
2020
|
|
Automation in Construction
|
|
S/C***
|
|
Artículo en revista científica
|
A model for fixed-cost batch transportation problem under uncertainty
|
Khalilzadeh M.
|
2020
|
|
Jordan Journal of Civil Engineering
|
|
S/C***
|
|
Artículo en revista científica
|
A project buffer and resource management model in energy sector; a case study in construction of a wind farm project
|
Zohrehvandi S.
|
2020
|
|
International Journal of Energy Sector Management
|
|
S/C***
|
|
Artículo en revista científica
|
The multi-objective supplier selection problem with fuzzy parameters and solving the order allocation problem with coverage
|
Khalilzadeh M.
|
2020
|
|
Journal of Modelling in Management
|
|
S/C***
|
|
JOURNAL_ARTICLE
|
APRT-FMEA buffer sizing method in scheduling of a wind farm construction project
|
|
2019
|
10.1108/ECAM-04-2018-0161
|
|
Crossref a través de ORCID
|
|
|
JOURNAL_ARTICLE
|
Identification and prioritization of factors influencing organization risk tolerance level
|
|
2019
|
10.1108/JAMR-07-2018-0061
|
|
Crossref a través de ORCID
|
|
|
Artículo en revista científica
|
A mathematical model for the capacitated location-arc routing problem with deadlines and heterogeneous fleet
|
Mirzaei-Khafri S.
|
2019
|
|
Transport
|
|
S/C***
|
|
Artículo en revista científica
|
A New Two-Stage Approach for a Bi-Objective Facility Layout Problem Considering Input/ Output Points under Fuzzy Environment
|
Mohamadi A.
|
2019
|
|
IEEE Access
|
|
S/C***
|
|
Artículo en revista científica
|
An integrated approach based on a bi-level genetic algorithm and a combined zone-LP for the facility layout problem
|
Mohamadi A.
|
2019
|
|
South African Journal of Industrial Engineering
|
|
S/C***
|
|
Artículo en revista científica
|
APRT-FMEA buffer sizing method in scheduling of a wind farm construction project
|
Zohrehvandi S.
|
2019
|
|
Engineering, Construction and Architectural Management
|
|
S/C***
|
|
Artículo en revista científica
|
Group multiple criteria ABC inventory classification using the TOPSIS approach extended by Gaussian interval type-2 fuzzy sets and optimization programs
|
Mohamadghasemi A.
|
2019
|
|
Scientia Iranica
|
|
S/C***
|
|
Artículo en revista científica
|
Identification and prioritization of factors influencing organization risk tolerance level
|
Khalilzadeh M.
|
2019
|
|
Journal of Advances in Management Research
|
|
S/C***
|
|
Artículo en revista científica
|
Integrated cost, quality, risk and schedule control through earned value management (EVM)
|
Khesal T.
|
2019
|
|
Journal of Engineering, Design and Technology
|
|
S/C***
|
|
Artículo en revista científica
|
A fuzzy multi-objective multi-product supplier selection and order-allocation problem in supply chain under coverage and price considerations: An urban agricultural case study
|
Hajikhani A.
|
2018
|
|
Scientia Iranica
|
|
S/C***
|
|
Artículo en revista científica
|
A multi-objective supplier selection model for green supply chain network under uncertainty
|
Khalilzadeh M.
|
2018
|
|
Journal of Modelling in Management
|
|
S/C***
|
|
Artículo en revista científica
|
A Nash bargaining model for flow shop scheduling problem under uncertainty: a case study from tire manufacturing in Iran
|
Safari G.
|
2018
|
|
International Journal of Advanced Manufacturing Technology
|
|
S/C***
|
|
Artículo en revista científica
|
CLUS-MCDA: A novel framework based on cluster analysis and multiple criteria decision theory in a supplier selection problem
|
Ijadi Maghsoodi A.
|
2018
|
|
Computers and Industrial Engineering
|
|
S/C***
|
|
Artículo en revista científica
|
Identification and Evaluation of Construction Projects’ Critical Success Factors Employing Fuzzy-TOPSIS Approach
|
Maghsoodi A.
|
2018
|
|
KSCE Journal of Civil Engineering
|
|
S/C***
|
|
Conference Paper
|
Linking “project success” and “strategic talent management”: Satisfaction/motivation and organizational commitment as mediators
|
Mahjoub M.
|
2018
|
|
Procedia Computer Science
|
|
No Aplica
|
|
Artículo en revista científica
|
Ranking and selecting the best performance appraisal method using the MULTIMOORA approach integrated Shannon’s entropy
|
Ijadi Maghsoodi A.
|
2018
|
|
Frontiers of Business Research in China
|
|
S/C***
|
|
Artículo en revista científica
|
Risk evaluation using a novel hybrid method based on FMEA, extended MULTIMOORA, and AHP methods under fuzzy environment
|
Fattahi R.
|
2018
|
|
Safety Science
|
|
S/C***
|
|
Conference Paper
|
Role of information cycles in construction of a wind farm power plant project
|
Zohrehvandi S.
|
2018
|
|
Procedia Computer Science
|
|
No Aplica
|
|
JOURNAL_ARTICLE
|
Green supply chain management using the queuing theory to handle congestion and reduce energy consumption and emissions from supply chain transportation fleet
|
|
2017
|
10.3926/jiem.2170
|
|
Crossref a través de ORCID
|
|
|
Conference Paper
|
A Heuristic Algorithm for Project Scheduling with Fuzzy Parameters
|
Khalilzadeh M.
|
2017
|
|
Procedia Computer Science
|
|
No Aplica
|
|
Conference Paper
|
A mathematical Model to select the Risk Response Strategies of the Construction Projects: Case Study of Saba Tower
|
Cheraghi E.
|
2017
|
|
Procedia Computer Science
|
|
No Aplica
|
|
Conference Paper
|
A multi-objective fuzzy project selection problem considering social responsibility and risk
|
Khalilzadeh M.
|
2017
|
|
Procedia Computer Science
|
|
No Aplica
|
|
Artículo en revista científica
|
Challenges and difficulties of technology commercialization − a mixed-methods study of an industrial development organization
|
Khalil Zadeh N.
|
2017
|
|
Management Research Review
|
|
S/C***
|
|
Artículo en revista científica
|
Green supply chain management using the queuing theory to handle congestion and reduce energy consumption and emissions from supply chain transportation fleet
|
Aziziankohan A.
|
2017
|
|
Journal of Industrial Engineering and Management
|
|
S/C***
|
|
Conference Paper
|
Planning project closure phase in combined cycle power plant projects
|
Zohrehvandi S.
|
2017
|
|
Procedia Computer Science
|
|
No Aplica
|
|
Artículo en revista científica
|
Studying the reverse supply chain model with remanufacturing
|
Bahari A.
|
2017
|
|
International Journal of Economic Research
|
|
S/C***
|
|
Artículo en revista científica
|
Investigating the relationship of sustainability factors with project management success
|
Khalilzadeh M.
|
2016
|
|
Industrial Engineering and Management Systems
|
|
S/C***
|
|
Artículo en revista científica
|
A honey bee swarm optimization algorithm for minimizing the total costs of resources in MRCPSP
|
Khalilzadeh M.
|
2015
|
|
Indian Journal of Science and Technology
|
|
S/C***
|
|
Artículo en revista científica
|
A honey bee swarm optimization algorithm for minimizing the total costs of resources in MRCPSP
|
Khalilzadeh M.
|
2015
|
|
Indian Journal of Science and Technology
|
|
S/C***
|
|
Artículo en revista científica
|
A modified PSO algorithm for minimizing the total costs of resources in MRCPSP
|
Khalilzadeh M.
|
2012
|
|
Mathematical Problems in Engineering
|
|
S/C***
|
|
Artículo en revista científica
|
An optimal procedure for minimizing total weighted resource tardiness penalty costs in the resource-constrained project scheduling problem
|
Ranjbar M.
|
2012
|
|
Computers and Industrial Engineering
|
|
S/C***
|
|
Artículo en revista científica
|
A Scatter Search Algorithm for RCPSP with discounted weighted earliness-tardiness costs
|
Khalilzadeh M.
|
2011
|
|
Life Science Journal
|
|
S/C***
|